# Singapore's MRT and LRT network: lines, station codes and what is opening next

> How the MRT and LRT lines and station codes are organised, how to read interchange stations, and the opening timelines LTA has announced for the Circle, Thomson-East Coast, Downtown, Jurong Region and Cross Island lines.

- Tool: [Singapore MRT Map](https://toolsg.com/en/mrt-map)
- Language: en (available: en, zh, ms, ta)
- Last verified against official sources: 2026-10-18
- Source site: ToolSG — a planning guide, not official or financial advice. Cite the agencies listed under Sources.

## Key figures at a glance

| Fact | Value | Source |
| --- | --- | --- |
| Lines in service | North-South, East-West, North East, Circle, Downtown and Thomson-East Coast MRT lines, plus the Bukit Panjang, Sengkang and Punggol LRT — Station codes use two letters and a number, such as NS1, EW24 or TE17. |  |
| Thomson-East Coast Line Stage 5 and Downtown Line 3 extension | Three new stations in the second half of 2026 — In the tool: TE30 and TE31 on the TEL, DT36 and DT37 on the DTL. | [LTA](https://www.lta.gov.sg/content/ltagov/en/newsroom/2026/3/news-releases/next-phase-of-rail-development.html) |
| Circle Line Stage 6 | Scheduled for mid-2026, with three new stations between HarbourFront and Marina Bay — The tool already shows these stations as in service. | [LTA](https://www.lta.gov.sg/content/ltagov/en/newsroom/2026/3/news-releases/next-phase-of-rail-development.html) |
| Jurong Region Line, Stage 1 | Around mid-2028 — Delayed from end-2027; interim shuttle buses are planned from end-2027. A new station JS2A serving Tengah is targeted for the mid-2030s. | [LTA](https://www.lta.gov.sg/content/ltagov/en/newsroom/2026/3/news-releases/next-phase-of-rail-development.html) |
| Cross Island Line | Phase 1 (CR2 to CR13) in 2030; Phase 2 and the Punggol Extension in 2032; Phase 3 in the late 2030s | [LTA](https://www.lta.gov.sg/content/ltagov/en/newsroom/2026/3/news-releases/next-phase-of-rail-development.html) |

## Planning a trip with the MRT map: step by step

The map shows the network and which stations are in service or future. For fares and live journey planning use LTA's own tools.

1. **Find your start and end stations** (Before the trip) — Search by name or code, such as Jurong East or NE6.
2. **Read the station codes** (On the map) — The letters show the line and the number shows the station's position. An interchange has more than one code.
3. **Check which stations are in service** (For newer stations) — Filter by status to see future stations and their announced targets.
4. **Plan transfers at interchanges** (When you change lines) — Walking between platforms at some interchanges takes several minutes.
5. **Check LTA for disruptions and fares** (Before leaving) — Use LTA's own app or website for live service status and fares.

## The network

| Line | Code | Colour | Notes |
| --- | --- | --- | --- |
| North-South Line | NS | Red | |
| East-West Line | EW (CG for the Changi Airport branch) | Green | |
| North East Line | NE | Purple | |
| Circle Line | CC | Orange | Stage 6 was scheduled for mid-2026 |
| Downtown Line | DT | Blue | Extension to Xilin and Sungei Bedok in 2H 2026 |
| Thomson-East Coast Line | TE | Brown | Stage 5 in 2H 2026 |
| Jurong Region Line | JS, JE, JW | Teal | Stage 1 around mid-2028 |
| Cross Island Line | CR, CP | Lime | Phase 1 in 2030 |
| Bukit Panjang LRT | BP | Grey | |
| Sengkang LRT | SE, SW | Grey | |
| Punggol LRT | PE, PW | Grey | |

## How to read a station code

A code is the line letters plus a number that rises along the line, for example **NE6** is the sixth station on the North East Line (Dhoby Ghaut). **Interchange stations** carry one code for each line they serve, such as an NS/EW pair. A letter suffix such as **TE22A** marks a station added between two existing numbers.

## What is opening next

| Project | What opens | When |
| --- | --- | --- |
| Circle Line Stage 6 | Three stations between HarbourFront and Marina Bay | Scheduled for mid-2026 (shown as in service in the tool) |
| Thomson-East Coast Line Stage 5 and Downtown Line 3 extension | Three new stations | Second half of 2026 |
| Jurong Region Line Stage 1 | First stations | Around mid-2028 |
| Cross Island Line Phase 1 | CR2 Aviation Park to CR13 Bright Hill | 2030 |
| Cross Island Line Phase 2 and Punggol Extension | | 2032 |
| Cross Island Line Phase 3 | | Late 2030s |

LTA is also studying the Seletar Line, Tengah Line and the JRL West Coast Extension, with no opening dates yet. Dates can move, and the tool shows the latest target it holds for each station.

**JS2A (Jurong Region Line):** LTA's March 2026 factsheet adds an in-fill station between JS2 and JS3 serving Tengah, which brings the line to 25 stations. Civil construction is under way and LTA targets the mid-2030s, in step with the developments around it. LTA has not yet published a station name or exact site, so the tool does not draw JS2A; the JRL counts elsewhere on this page are for the 24 stations on the map.

> **Tip:** A station labelled "future" on the map is a target, not a promise. Check LTA's announcements before you plan around a new station.

## Common mistakes

- **Assuming a planned station is open.** Check the status on the map.
- **Reading the number as distance.** It is the order along the line.
- **Forgetting to allow for transfer time** at large interchanges.
- **Using this map for live service.** Use LTA for disruptions and fares.

## Related tools

- [Public holidays](https://toolsg.com/en/public-holidays) — holidays that change train timings and crowds.
- [Town Council finder](https://toolsg.com/en/town-council-finder) — which Town Council manages your estate.

## Frequently asked questions

**How many MRT lines does Singapore have?**

Six MRT lines are in service: North South, East West, North East, Circle, Downtown and Thomson-East Coast. Two more are under construction — the Jurong Region Line (from mid-2028) and the Cross Island Line (from 2030). There are also three LRT systems, in Bukit Panjang, Sengkang and Punggol.

**Which new MRT stations open next?**

Xilin and Sungei Bedok on the Downtown Line, and Bedok South and Sungei Bedok on the Thomson-East Coast Line, are due in the second half of 2026. Founders' Memorial follows in 2028, and the first stage of the Jurong Region Line in mid-2028.

**When will the Cross Island Line open?**

LTA plans to open Phase 1, 12 stations from Aviation Park to Bright Hill, in 2030. The Punggol extension and Phase 2 to Jurong Lake District are planned for 2032.

**Is the Circle Line a full loop now?**

Yes. Circle Line Stage 6 opened on 12 July 2026 with Keppel, Cantonment and Prince Edward Road, linking HarbourFront back to Marina Bay and closing the loop.

**What do the letters in MRT station codes mean?**

They are the line: NS North South, EW East West, CG Changi Airport branch, NE North East, CC Circle, DT Downtown and TE Thomson-East Coast. The number is the station's position along that line, and interchanges carry one code per line.

**Are future station locations exact?**

No. Stations in service use LTA's published coordinates, but future stations are approximate and their final sites, names or dates may change. Check LTA for the latest details.


## Sources

- [LTA — Next phase of rail development (Mar 2026)](https://www.lta.gov.sg/content/ltagov/en/newsroom/2026/3/news-releases/next-phase-of-rail-development.html)